2010 Tennessee Concrete Pavement Conference

March 9-10, 2010 – Embassy Suites Nashville Airport – Nashville, TN

Tuesday, March 9, 2010

::    I-440 Concrete Pavement Rehabilitation Case Study, Jay Norris, PE, Special Projects, TDOT Region 3
::    I-440 Concrete Pavement Rehabilitation Case Study, Donald Looney, Division Manager, LoJac
::    SHRP 2 Renewal Projects Research Overview, James Bryant, PE, TRB, National Academy of Sciences
::    Good Solutions for Challenging Times, Leif Wathne, PE, ACPA
::    Drainable Base Layers Revisited, Robert Rodden, PE, ACPA
::    Commercial Concrete Pavement Applications – Prevost Cast Study, Doug Poe, Irving Materials
::    Pervious Concrete Pavements, Alan Sparkman, TCA
::    Design & Construction of Commercial Concrete Pavement, Tim Cost, Holcim (US) Inc.

Wednesday, March 10, 2010

::    Alternate Design/Alternate Bidding Experiences, Paul Looney, PE, Pavement Design Engineer, Kentucky Transportation Cabinet
::    Interstate 75 – GDOT’s Experience Replacing Asphalt with Concrete, Robert Bird, Archer Western
::    Sustainability of Concrete Pavements, Charles Cox, LEED AP, Lafarge NA
::    Life-Cycle Cost Analysis, Tashia Clemons, FHWA
::    National Life-Cycle Cost Analysis, Nathaniel Coley, FHWA
::    Concrete Pavement Solutions With Roundabouts, Michael Thompson, P.E., City of Kingsport
::    Concrete Roundabouts, Barry Wilder, CPAT
::    Full-Depth Reclamation Using Cement, Joe Vail, The Miller Group
::    RCC for Streets And Local Roads, Eddie Tate, City of Chattanooga